Choose a hook that s rated to hold more than the weight of the object you are hanging.
Hanging joists from cement basement wall.
Avoid expanded foam insulation the type that has little white beads pressed.
If you want to hang something from a cement wall try using adhesive hooks so you don t have to put a hole in the wall.
If you re building a wall in place start by lining up the top and bottom plates and mark where the studs need to go.
Moisture below the slab can wick up into the concrete and get to the base plates of the wall.
For applications where the floor joists run parallel to the concrete block wall the floor joist that runs adjacent to the wall can be installed in the same manner as the ledger beam using concrete anchors.
Make sure wall studs don t come into contact with the foundation wall.
This is why you need to use treated lumber for the bottom plate of the wall.
I wasn t expecting this.
Start by checking if the floor and ceiling are level.
Installing an egress window involves excavating the soil away from the foundation cutting through the basement wall and installing the window and a window well making it possible for a person.
The cool concrete of the foundation wall will collect humid air which will condense on its surface.
Instead i was expecting to see the floor joists sitting on top of the foundation wall.
When this is the case the floor joist against the block wall should be pressure treated wood.
When you re ready to hang the hook clean the surface of the wall with rubbing alcohol then peel off the backing from the hook and.
What are the pros cons of doing it one way or the other when it comes to installing exterior foam on the above grade walls installing interior foam on the.
An unfinished basement with its concrete floor and exposed joists may seem dreary and cold.
Extruded polystyrene foam can be yellow pink or blue depending on the manufacturer for insulating basement walls.
But in reality it is an enormous blank canvas just waiting for your inspired ideas and artistic vision.
If it is not you will need to measure for each stud by nailing the top plate to the ceiling joist.